Maintenance Manual: Green Spine WSUD Project

Jamie Tainton & Rod Wiese / Storm Consulting Ltd Pty

03/12/2010

This Maintenance Manual represents a framework for the management of the Water Sensitive Urban Design (WSUD) components within the "Green Spine", Maroondah Highway.  It provides information to enable managerial and maintenance staff from Yarra Ranges Shire Council to manage the WSUD features in a flexible manner that can be refined in the light of accumulated experience. 

Routine checks and maintenance are required to ensure the system functions as designed and is vital to the longevity of the project and its performance.